Logo
Logo
Close
  • English
  • தமிழ்
  • తెలుగు
  • ಕನ್ನಡ
  • മലയാളം
  • About Us
    • Newsletters
  • Environmental Impact Assessment
    • Impact of Thermal Power Plants
    • What is EIA?
    • Effective Intervention In the EIA process
    • Frequently Asked Questions
    • Campaign Tools And Tips
    • Thermal power plant EIA formats
    • Resources
  • Renewable Energy
    • Shift to Renewable Energy
    • Renewable Energy Development In India
    • Resources
  • Thermal Power Plants in India
    • TPP Map and Database
    • Resources
  • Search

Search form

HomeComments on proposed grant of TOR to MIDPL for Adani Kattupalli Port Expansion

Comments on proposed grant of TOR to MIDPL for Adani Kattupalli Port Expansion

Marine Infrastructure Developer Private Limited (MIDPL) proposed a revised Master Plan Development of the Adani Port at Kattupalli, Tiruvallur District. When the project was scheduled for discussion by the Expert Appraisal Committee, CAG shared its concerns regarding the same, and demanded that a site visit be undertaken by experts, before arriving at a decision on grant of Terms of Reference (TOR).

 
PDF icon CAG EAC letter for MIDPL.pdf
Tags:   TOR, EAC CRZ-Infra 2, comments, Environmental Impact Assessment, port expansion, Adani, Environmental Clearnace

Download Handbook

You can download Thermal Watch Handbook in Four different languages

 

  • English
  • Kannada
  • Tamil
  • Telugu
  • Hindi

Recent Posts

Limiting The Pollution From Coal-Based Power Plants
Debunking the science behind “Net-Zero”
The Power of PR: How Induced Climate Denial is Becoming Big Business
CLIMATE CRISIS: A TICKING TIME BOMB
Sustainable Behaviour: Everyone speaks about it, nobody practices it, why?

Contact Info

Office: New #246 (Old #277B), TTK Road (J.J. Road), Alwarpet Chennai Tamil Nadu 600018 India

Phone: +91-44-24660387

Fax: +91-44-24994458

Email: tpp@cag.org.in

Contact

Drupal development company : Red Crackle
  • Follow:
Log in

or
Login via facebook
Login via twitter